Guangzhou DSTSA Construction Material Co., Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Slab formwork supporting system
formwork system
1 as Doka/Peri system
2 prop joint no clamp/fastener
3 steel beam replace H20 beam
4 can be adjustable
The combination of our slab systems : main beam / sub beam / vertical props/ horizontal props and u head jack
specification
Name of commodity |
Length (m) |
Unit weight (KG / PCS) |
Main beam |
2.68-4.39 |
20.8 |
2.28-3.68 |
17.6 |
|
1.27-2.88 |
13.55 |
|
1.17-1.78 |
8.8 |
|
Sub Beam |
1.15 |
3.25 |
0.8 |
2.35 |
|
0.4 |
1.25 |
|
Vertical Props |
2.55 with 2 plates |
9.5 |
1.95 with 1 plate |
7.6 |
|
1.35 with 1 plate |
5.5 |
|
1.05 with 1 plate |
4.4 |
|
0.75 with 1 plate |
3.4 |
|
Horizontal props |
1.22 |
3.9 |
0.87 |
2.80 |
|
0.47 |
1.6 |
|
U head jack |
700 |
2.54 |
formwork system
1 same as Doka system
2 no need clamp / fasteners
3 can be adjustable
4 ste