Guangzhou DSTSA Construction Material Co., Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Construction Steel Tunnel Formwork System Galvanized with High Frequency Welding
Accessories: |
Main Beam/Cross Props/Sub-Beam/Base Jack/Coupler
|
Surface Treatment: | Electroplated Galvanized | Technique: | High Frequency Welding |
Working Load: | 3-4 tons | Size: | Adjustable System/Suit For Projects | Usage: | Construction Shuttering Support |
Feature: | Construction Steel Tunnel Formwork |
Concrete Formwork Building System: |
All Right | Steel Scaffolding System: | All Right |
1.Construction Steel Tunnel Formwork
2.Electroplated Q235 Steel
3.Quick Erect Formwork
4.High Frequency Welding
5.Customized
Detailed Information
Features of Metal Formwork:
1. Usage: Can be used for all concrete structures such as walls, columns, beams, slabs, etc.
2. Metal formworks are clamped together by screw and nut for easy and quick assembly and dismantling.
3. Metal formworks have greater strength which offer the possibility to greatly reduce the cost of supports.
4. Metal formworks are firmly and tightly set and these ensure accurate job and enhance the quality of concrete work.
5. Metal formworks provide smooth concrete surfaces that are free of stress, bulge and torsion. Thus, formwork are suitable for uncoated and spray coated surface.
6. Model e. G.: P3015 300*1500*55mm
7. Metal Formwork including: Metal formwork panels, internal angle formwork, external angle formwork, angle formwork.
8. OEM is available
9. If you can provide the drawing of your building, formwork system plan will be given to you by our technologist.
10. Also we could provide:
Supporting system, scaffolding props, scaffolding couplers, H20 timber beam, WPC Moulding Board, 63 Metal Frame & Plywood formwork, adjustable wall formwork, etc