Guangzhou DSTSA Construction Material Co., Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1.Description of adjustable construction metal scafflolding system
1) adjustable construction metal scafflolding system------a hand-set formwork system designed with lightweighyt steel construction and ellectrophoretic-painted structures supporting the wood/plastic composite sheet. This new designed system reputed for fast erection & dismatled, replace steel panel floor formworks.
2)Speed--------quicker to put up and quicker to take down; minimal crangeage requirement during formwork set-up; 100squares only request half an hour for a labor; efficient solutions to infill zones.
3)Safety-------productivity on safe ground; pre-defined erection sequence each part put on safety; wedge plate built in the props for fast connection between vertical and horizontal props.
4)Simplicity------easy to explain and easy to use; introductory training doesn't take long, as few components and very logical erection sequence; infill gap are very easy to operate.
5)Recycle--------great results,time after time,made possible by tried-and-tested.; the new system is famously long lived and permits 300 times reused with no change of form-facing.
adjustable construction metal scaffold System
|
|||||
Title | Length(m) | Diameter (mm) | Thickness(mm) | Material | Surface Finish |
vertical props | 2.55 | 48 | 2.75~3.00 | Q235 |
Electrophoretic Painting |
1.95 | 48 | 2.75~3.00 | Q235 | ||
1.35 | 48 | 2.75~3.00 | Q235 | ||
1.05 | 48 | 2.75~3.00 | Q235 | ||
0.75 | 48 | 2.75~3.00 | Q235 |
Electrophoretic Painting |
|
horizontal props |
1.22 | 48 | 2.75~3.00 | Q235 | |
0.87 | 48 | 2.75~3.00 | Q235 | ||
0.47 | 48 | 2.75~3.00 | Q235 |